POWERSLIDE NEXT ROJO 110 (SAMPLE)

Rugged elegance.

Out of stock Unavailable
Only %1 left
SKU
PS-908374SAMPLE

The Powerslide NEXT is the first of its kind - the first TRINITY 3-point mounting hardshell Inline skate in the world. The Next offers plenty of custom options for you to personalize your ride.

This skate is full of incredible features such as the super comfortable heat moldable MYFIT Recall liner covering two sizes, plus the resilient and stylish casted aluminum frame.

Technical specs:

- Boot: glass-fiber reinforced plastic (GFRP) - GFK.

- Heat moldability: MYFIT liner with 90°C.

- Closure: micro adjustable buckle, micro adjustable ratchet buckle, standard lacing.

- Liner: MYFIT Recall dual.

- Mounting standard: TRINITY 3-point.

- Frame: Powerslide AL.

- Wheels: 110mm.

More Information
Warranty 2 years
Wheel Size 110 mm
Brands POWERSLIDE
Availability Unavailable
Price €269.99
Write Your Own Review
Only registered users can write reviews. Please Sign in or create an account

This sizing chart can guide you choosing the size of your Powerslide Swell Lite, Swell Road, Swell City, Next Core, Next Outback and Next SUV skates.

EU36-3738-3940-4142-4344-4546-4748-49
UK4-4.55-66.5-78-99.5-1011-11.512.-125
US(W)6-6.57-88.5-910-11   
US(M)5-5.56-77.5-89-1010.5-1112-12.513-13.5
MM229-236242-248255-261269-275282-289296-303309-315

If you have questions about which size to choose, follow this instructions and find the size that matches you.

Related products
  1. FR FRX 80 BLACK
    FR FRX 80 BLACK
    As low as €159.99
  2. FILA HOUDINI PRO BLACK-WHITE
    FILA HOUDINI PRO BLACK-WHITE
    As low as €239.99
  3. POWERSLIDE NEXT RENEGADE WERBESKI PRO 125
    POWERSLIDE NEXT RENEGADE WERBESKI PRO 125
    As low as €479.99
  4. FR SKATES FRX 80 ORANGE
    FR SKATES FRX 80 ORANGE
    As low as €159.99
  5. POWERSLIDE NEXT CHARCOAL 110
    POWERSLIDE NEXT CHARCOAL 110
    As low as €369.99
More from POWERSLIDE

Guaranteed secure payments

Urgent 24h shipping

2 years warranty

Free shipping from €50

Returns up to 90 days